4. Identification of potentially feasible options
4.1 Train Service Choices
Service development choices have been identified and evaluated to examine
the traffic potential for route extension options.
Ryde - Ventnor:
extension of Ryde - Shanklin trains to Ventnor, calling at
Wroxall.
Smallbrook - Newport (Barton): a shuttle service from
Smallbrook terminating in the east of Newport town adjacent to Victoria Road
with connections for Island Line at Smallbrook.
Ryde - Newport
(Barton): through services from Ryde Pier Head to Newport (Barton) terminus.
Ryde - Newport (Quay): the services would access Newport by means
of a new alignment to Newport Quay involving a short section of 'street running'
necessitating operation by appropriate light rail tram vehicles.
Ryde
- Newport (town centre loop): the services would access the centre of
Newport by means of a street running loop via the Quay.
Shanklin -
Newport & Ryde - Newport: a Shanklin service via a new chord line south
of Smallbrook to Newport town centre loop in addition to the above Ryde
service.
Ryde - Cowes terminus via segregated rail route through
Newport: an attractive through journey time (Ryde -Cowes) would be sought by
recreating a 'heavy rail' segregated alignment through Newport and into Cowes
town (if found to be feasible).
Ryde - Cowes town centre via street
running route through Newport: services accessing Newport and Cowes
town centres with street running in the towns.
Shanklin - Cowes plus
Ryde - Cowes: a Shanklin service via a new chord line south of Smallbrook to
Cowes town centre in addition to the above Ryde service.
Ventnor -
Cowes, Ryde - Ventnor and Ryde - Cowes: this service tests the impact of
any network synergy effect and assumes street running through Newport and into
Cowes town centre.
Both hourly and half-hourly service frequencies have
been evaluated for each of these service choices.