FEES


The Council is required to charge a fee for its Building Control Services. However, fees are not charged for the provision of facilities solely for the benefit of a person with disabilities. Proof of disablement registration is required at the time of submission.

To view our scale of fees from 1st December 2008 – VAT at 15%, click here.

(To view our previous scale of fees – VAT at 17.5% - please click here)
Which Fee Schedule / Table Applies?
Schedule / Table 1

New dwellings only



Schedule / Table 2

Erection / extension of a garage, extensions & loft conversions (inc. replacement windows & electrical installations (domestic only)



Schedule / Table 3

All other works i.e. commercial extensions, garage conversions, internal alterations i.e. removal of loadbearing wall, domestic extensions over 60m²
Which Application Type?
Building Notice Application
A Building Notice should ideally only be used for minor building projects. When a Building Notice is submitted the full fee is payable on deposit and no further fee is required.

Full Plans Application
When depositing Full Plans the fee is divided into two payments. The first or “plan fee” is paid when the plans are deposited. This fee covers work carried out on checking the plans for conformity with the Regulations. The second or “inspection fee” is payable after the first inspection has been carried out (you will be invoiced separately with details of how and where to make your payment).

It should be noted that whichever system is used, the total fee is the same. The Building Notice fee (paid on deposit) and the full plans inspection fee is a once-and-for-all payment irrespective of the number of occasions the Building Control Surveyor visits the site.

Regularisation Applications
A Regularisation Application may be submitted when the building owner wishes to regularise work which has been carried out over a year ago, and for which a ‘Building Notice’ or ‘Full Plans Application’ were not submitted prior to work commencing. The fee payable is based on 120% of the equivalent Building Notice fee. For assistance in calculating the appropriate fee, please contact Building Control.